This past week major progress on Avatar. Hauled out on Monday June 15th. We removed two thru hull fittings and they were glassed in. The barnacles in side the valve were amazing. And kind of a chore to removed them. Bottom is now prepped and ready for paint, but will be the last thing that gets done. We installed all 3 new transducers for the depth sounder, fish finder and forward seeking sonar, hope that helps us to keep away from the bottom! They were different sizes so holes had to be made bigger and one new one drilled. It is never easy drilling a hole in the bottom of your boat!!! You make sure the transducer is gooped in good and tight, so no leaks! Topsides now ready for another sanding with fresh primer on her. New cutlass bearing installed where prop shaft comes out of the boat. There will be more work out of the water this coming week too.........Stay tuned ;-)
In the Travel Lift Don Jose
removed valves
Thru Hull being stubborn
Antonio #1 has the right tools
Antonio #2 bottom guy and fiberglassman extraordinaire
once thru hull removed makes the hole ready to fiberglass
Antonio #2 grinding away to build back up
Bottom forward old holes and tape marking where to drill new one
Mike adjusting transducer
Modified Transducer holes
View from inside with new sonar in place
hole from old transducer
new sonar transducer
Hull thickness
Antonio #2 and Beto #1 working on prep
Beto fine sanding
Beto and Edy covering for over spray
Avatar on her jack stands
Bow primed
Starboard side primed
Beto #1 and Beto #2 with the spray gun
New Cuttlass Bearing installed